Epson Innovation Center

Architectural DataFeaturesCasbee ScoreTechnical Details建物リストに戻る
Site plan
Site plan Figure 1: Typical floor plan, Figure 2: Cross section of building A, Figure 3: Cross section of C-Cube Project concepts and technology realized Main energy-saving approaches
Figure 1: Southern side equipment balcony and flexibility, Figure 2: Southern side balcony and load reduction approach      

Special Features

Q-1 Indoor Environment
  • 2-way sock filter system
  • Outside insulation, roof greening, low-e glass, eave rising type blind
  • Daylight blind control, individual lighting equipment control
  • Natural ventilation window automatic opening-closing control
  • CO2 concentration control
  • Separate smoking area
Q-2 Quality of Service
  • OA floor: 100 mmh
  • Sufficient outlet capacity: Laboratory: 60 VA/m2, experiment room: single-phase 150 VA/m2, three-phase 200 VA/m2
  • Upgraded PS, DS, and EPS
  • Sufficient ceiling height (general floor: 2.9 m, special floor: no ceiling)
  • Sufficient story height (general floor: 4.5 m, special floor: 6.0 m)
  • The research building is designed to be seismically isolated structure.
Q-3 Outdoor Environment on Site
  • Greening within the site, roof greening
  • Introducing daylight and natural wind through the use of balconies
  • Considerations for ventilation within the site, higher position of artificial heat exhaust
LR-1 Energy
  • High heat insulation, eaves, low-e glass
  • Natural daylight through light shelves and light ducts
  • Natural ventilation
  • Use of ground heat by a cooling heating trench system
  • Photovoltaic power generation, vacuum type solar water heater
  • Free cooling, cooling water heat recovery
  • BEMS
  • Highly efficient air conditioning heat source unit
LR-2 Resources and Materials
  • Water saver, use of rainwater, recycling of air conditioning drainage
  • Adoption of eco-materials (wooden interior, wooden reservoir, etc.)
LR-3 Off-site Environment
  • Evacuation of smoke and soot by an LPG boiler
  • Installation of a scrubber for the experiment exhaust system
  • Installation of a wastewater treatment unit for the experiment wastewater system, and setting of strict control standard values
  • Installation of a storage tank for emergency rainwater outflow prevention

Other Features

N/A

Previous BuildingPrevious Building Next BuildingNext Building
These cases are described based on assessment results obtained using CASBEE.
CASBEE is a method for rating the environmental performance of buildings using Building Environmental Efficiency (BEE) as an indicator, which is based on the results of separate scores obtained for Q-1~Q-3 (Quality) and LR-1~LR-3 (Load Reduction).