Tokyo Gas Kouhoku NT Building "Earth Port"
				
				
				
				
				
					
									
					
						Special Features
						
						
						
							
								| Q-1 Indoor Environment | 
								    Masking effect by a wall of waterfall  
Adaptability of floor layout by floor panels with air outlet.
Light Shelf 
High level of thermal and sound insulation by two-layer energy-saving glass  | 
							
								| Q-2 Quality of Service | 
								    Sense of openness and space due to ceiling height of 2.8-3.4m 
Wide space for refreshment 
Free room design due to pillarless office space
Convenience of equipment renewal due to removable floor  | 
							
								| Q-3 Outdoor Environment on Site | 
								    Continuity with surrounding town by planting of exterior areas on site  
Mitigated heat environment due to rooftop concentration of artificial heat exhaust  | 
							
								| LR-1 Energy |  | 
							
								| LR-2 Resources and Materials | 
								    Rainwater use system and Gray water reuse system
Use of natural materials (wooden OA floors), recycled materials (recycled concrete)
								        
							         | 
							
								| LR-3 Off-site Environment | 
								    Composting of organic garbage
Low-noise equipment
								        
							         | 
						
						
						Other Features
						N/A
					 
				 
			 
			
			
			
			These cases are described based on assessment results obtained using 
CASBEE.
			CASBEE is a method for rating the environmental performance of buildings using 
			Building Environmental Efficiency (BEE) as an indicator, which is based on the results of 
			separate scores obtained for Q-1~Q-3 (Quality) and LR-1~LR-3 (Load Reduction).