Panasonic Electric Works Tokyo Headquarters building

Architectural DataFeaturesCasbee ScoreTechnical Details建物リストに戻る

Comprehensive indoor environment adjustment system used in offices on the typical floor

click to enlarge
Air conditioning system for two-layered open ceiling space on west side
Air conditioning system for two-layered open ceiling space on west side Simulation of thermal environment in open ceiling space on west side Air conditioning system for standard floor Electric blind and window on east side
Natural ventilation window on east side      

The two-layered open ceiling space on the west side is in a disadvantageous position in the built environmental point of view; however, it is in the best position in terms of the topography of the site and landscape. In this space, the PMV value is as low as 0.6 even in midsummer thanks to the adoption of air flow windows (i.e. air flows between the double glasses), automatic blind control, and under-floor air supply system,which achieves comfort and energy conservation. On the east side, comfort and energy conservation are ensured by air flow close to the window, natural ventilation windows, and a VAV air conditioning system. All of the exterior glass is low-e glass and contributes to improved thermal insulation.

Area control system

click to enlarge
Office lighting control
Office lighting control Control unit of area control Operation flow of area control Control flow of area control by BACnet

In the minimum control unit inside each office, this system handles lighting, air conditioning, and crime prevention with a single human presence detection sensor. It is designed to save energy in each office when no one is present.

Lighting/air conditioning/blind cooperative control system

click to enlarge
Lighting/air conditioning/blind cooperative control
Lighting/air conditioning/blind cooperative control

This system puts lighting, air conditioning systems, and blinds in the optimum cooperative state to control the trade-off relationship in which an air conditioning load is produced when natural light is introduced, or no natural light enters the room and the power consumption of lighting increases when blinds are closed.

Monitoring system and approach to promotion of continuous energy saving

click to enlarge
Flow of energy measurement data
Flow of energy measurement data Energy measurement in an office on the standard floor Heat consumption metering unit Power consumption metering uni
PDCA cycle of energy-saving operation

To promote energy conservation after the building was completed, all air conditioning systems were designed to perform metering of heat consumption and detailed metering of electrical power consumption by power units, lighting, and outlets in each zone, as well as metering of water. As a result, the energy consumption has been reduced by about 29% since the completion of construction.

 

Previous BuildingPrevious Building Next BuildingNext Building
These cases are described based on assessment results obtained using CASBEE.
CASBEE is a method for rating the environmental performance of buildings using Building Environmental Efficiency (BEE) as an indicator, which is based on the results of separate scores obtained for Q-1~Q-3 (Quality) and LR-1~LR-3 (Load Reduction).